Mixing pump G 4 X Super / G 4 X XL / Part 2 Overview, operation and service
Operation
5.5
Putting the machine into operation
5.5.1
Checking the mortar consistency
Figure 48: Consistency inspection tube
1. Connect consistency inspection tube to the mortar pressure gauge.
2. Place a bucket or tray below the consistency inspection tube.
Mortar consistency inspection tube 25M
Item no. 20104301
5.5.2
Feeding material to the machine
1
3
2
4
7
5
Figure 49: Switching on the machine
1. Turn the main switch (1) to "ON".
2. Turn the level sensor selector switch (2) to "right" position.
3. Turn the booster pump selector switch (3) to the "AUTO" position.
4. Turn the selector switch star wheel (4) to the "AUTO" position.
5. Switch the machine one by pressing the green pushbutton (5)
control voltage "ON".
6
Figure 50: Checking the consistency
6. Check mortar consistency at consistency inspection tube (6).
7. Switch off the machine by pressing the red pushbutton (7) control
voltage "OFF".
8. Remove consistency inspection tube (6) and clean.
page 39 / 72