PFT continuous mixer HM 2002 Overview - Operation - Spare parts lists
Transport, packing and storage
2017-03-14
19
16.2 Transport inspection
On receipt check the delivery immediately for completeness and
transport damage.
In case of externally visible transport damage, proceed as follows:
Do not accept the delivery or under reserve only.
Note the extent of damage on the transport documentation or
on the delivery note of the carrier.
NOTE!
Report any defect as soon as it is detected. Claims
for damages can be asserted only within the valid
warranty period.
16.3 Transport in individual parts
Fig. 14: Transport
The mixing tube can be removed in order to make it easier to
transport the machine.
1.
Release quick-release fasteners (1) and remove the mixing tube
(2) from the front.
16.4 Transport of machine in operation
Carry out the following steps before beginning the transport:
1. First unplug the mains cable.
2. Remove water supply line.
3. Start transport.
1
2