PFT continuous mixer HM 2002 Overview - Operation - Spare parts lists
Examination
6
2017-03-14
2 Examination
2.1 Examination by machine operator
Prior to each shift, the machine operator has to examine the
effectiveness of the control and safety devices as well as the
proper fitting of the protection devices.
The safe working condition of construction machinery has to be
checked by the machine operator during operation.
If the safety devices show any defects or if any other defects are
detected that compromise a safe operation, the supervisor has to
be informed immediately.
In case of defects that cause harm to persons, the operation of the
construction machine has to be stopped to eliminate the defects.
2.2 Periodic inspection
Construction machinery has to be inspected for their safe working
condition in accordance with the operating conditions and the
operational requirements as needed, however at least once a year
by an expert.
Pressure vessels have to undergo the prescribed expert
inspections.
The inspection results have to be documented and kept at least
until the next inspection.
3 General information
3.1 Information regarding the operating manual
This operating manual gives important information on handling the
device. A prerequisite for safe working is the observance of all
stated safety guidelines and instructions.
Furthermore the local accident prevention guidelines and general
safety instructions for the application area of the device are to be
adhered to.
Read the operating manual thoroughly before starting any work! It
is a part of the product and has to be kept near the tool and easily
accessible to the staff at all times.
If the tool is given to third parties, also include the operating
manual.
The figures in this manual are for presentation purposes of facts
not necessarily to scale and may slightly differ from the actual
model of the device.