PFT SCREW MIXER HM 24 Overview – Operation – Spare Parts Lists
Packaging
16
2017-08-07
12.2 Transport inspection
Immediately after receipt, check to ensure that the delivery is
complete and free of transport damages.
Proceed as follows if there are externally identifiable transportation
damages:
Do not accept delivery or accept delivery only under
reservation.
Mention the scope of damage on the transport documents or on
the delivery receipt of the transport agency.
NOTE:
Complain about each defect as soon as it is
detected. Damage claims can be filed only within
the valid complaint periods.
Transportation of machine already
in operation
DANGER!
Danger of injury through mortar discharge!
Face and eyes can be damaged.
Perform the following steps before transportation:
1.
Pull out the main power cable first.
2.
Detach all other cable connections.
3.
Remove water supply line.
4.
Start transportation.
13 Packaging
On packaging
The individual units are packaged in accordance with the expected
transport conditions. Environment-friendly materials were used for
packaging.
The packaging should protect the individual components from
transport damages, corrosion and other damages up to installation.
Hence, do not destroy the packaging and remove it only just before
installation.