____________________________________________________________________________________________________________
PFT HM 6 400V TITAN
10
Setting up the machine
Version 02.2003
____________________________________________________________________________________________________________
_______________________________________________________________________________________
Knauf PFT GmbH & Co.KG
Telefon
09323 / 31-760
Postfach 60
Telefax
09323 / 31-770
D-97343 Iphofen
info@pft-iphofen.de
_______________________________________________________________________________________
KPS1
The HM 6 is created for KPS 1 operation.
To work with KPS 1 connect 10 pin plug.
To work without KPS 1 connect the blind plug.
Water Supply
- Connect a 3/4“ hose to water mains. Open water discharge valve slightly. Let wa-
ter run through the hose to dearest and clean it. Wait till water comes out of the
hose
- Shut off water discharge valve
- Connect water hose to water inlet on the machine (dirt filter)
- Open the water mains.
Connect water
From water tap (tank) to booster pump
From booster pump to water manifold
From water manifold to mixer
WARNING
While using stored water from a tank, connect the suction inlet with a filter
(Item no. 00 00 69 06).
The machine is now on stand by.
After touch the green button the machine works.
For a test rum use the blind plug.
When the machine is working connect the KPS 1 probe.
Mortar Consistency
Adjust the needle valve in such a way that the machine emits trowel-suited mortar at
the mortar outlet.
NOTE:
Follow all material mixing instructions of the mortar manufacturer!
Interrupting Work
The length of a break during operation will depend on the material and on the
conditions at the construction site (e.g. temperature, humidity etc.).
2
1