____________________________________________________________________________________________________________
PFT HM 6 400V TITAN
2
PFT Introduction
Version 02.2003
____________________________________________________________________________________________________________
_______________________________________________________________________________________
Knauf PFT GmbH & Co.KG
Telefon
09323 / 31-760
Postfach 60
Telefax
09323 / 31-770
D-97343 Iphofen
info@pft-iphofen.de
_______________________________________________________________________________________
First inspection after delivery
It is mandatory that all delivery technicians check the machine settings at the end of the first running
operation. Factory settings can change during the initial phase of operation. If necessary, resetting should
take place right after initial run, without which faults are likely to set in.
After handing over the machine and approx. two hours into the initial operation, delivery technicians must
inspect the following items and settings:
1. Water safety switch
2. Solenoid
valve
3. Pressure reducing valve
4. Motor safety switch
^