____________________________________________________________________________________________________________
PFT HM 6 FU 230V HYMIX
13
Maintenance
Status 11.2004
____________________________________________________________________________________________________________
_______________________________________________________________________________________
Knauf PFT GmbH & Co. KG
Telephone 09323 / 31-760
PO Box 60
Fax
09323 / 31-770
D-97343 Iphofen
Internet
www.pft.de
_______________________________________________________________________________________
Measures in the event of a power failure
The PFT HM 6 is equipped with a restart block. After a power failure, the unit must
again be brought into operation by pressing the green ON switch.
Measures in the event of water failure
The PFT HM 6 shall come to a standstill in the event of water failure. As soon as the
fault has been remedied, the PFT HM 6 shall again mix normally.
Measures in the event of a danger of frost
In the event of a danger of frost, the water fitting of the PFT HM 6 must be emptied. To
do this:
- depressurise the water supply and uncouple,
- open the drain tap on the fitting block,
- pull out the power cable,
- depressurise the water supply and uncouple,
- place the mixing tube with the mixing shaft in the transport support and secure with
snap fasteners.
Maintenance
ATTENTION!
Maintenance and assembly work may only be carried out when the machine is without
power!
After use, the PFT HM 6 must be checked for any damage to bearings, drive pin jaw,
connecting elements, hose and cable connections.
The dust collector filter in the water gully as well as in the pressure reducer valve must
be removed and cleaned every 2 weeks and, if necessary, replaced. The filter cup
must be opened using a special key (article number 20 10 24 00).
Transportation
Transport the HM 6 only when secured on a Euro pallet!
HM 6 is not suitable for crane transportation!
Prior to transportation, pull out the power cable, depressurise the water supply and
uncouple.