____________________________________________________________________________________________________________
PFT HM 6 FU 230V HYMIX
2
General
Status 11.2004
____________________________________________________________________________________________________________
_______________________________________________________________________________________
Knauf PFT GmbH & Co. KG
Telephone 09323 / 31-760
PO Box 60
Fax
09323 / 31-770
D-97343 Iphofen
Internet
www.pft.de
_______________________________________________________________________________________
Initial inspection after delivery
An indispensable task of all fitters who deliver the PFT
HM 6
is to check the machine settings after the initial
starting up. The plant settings can change during the initial starting. If these are not corrected in good time,
immediately after the warming up, there is a risk of breakdowns.
Fundamentally, after every supply fitter has successfully handed over and introduced the
PFT
HM 6
, i.e. after the first two operating hours, the following checks and settings should be carried out:
1. Function of the solenoid valve
2. Shaft connections
3. Setting the pressure reducer
4. Setting the motor safety switch
5. Water pressure switch
ATTENTION!
The enclosed guarantee card must be sent in – without a card there is no guarantee!