background image

 

 

____________________________________________________________________________________________________________  

PFT HM 6 FU 230V HYMIX 

Basic safety notices 

Status 11.2004 

____________________________________________________________________________________________________________  

_______________________________________________________________________________________ 

 

Knauf PFT GmbH & Co. KG 

 

Telephone  09323 / 31-760 

PO Box 60 

 

Fax 

09323 / 31-770 

D-97343 Iphofen 

 

Internet 

www.pft.de 

_______________________________________________________________________________________ 

1.  All safety and danger information on the machine must be observed and kept in a read-

able state! 

2.  The machine must be checked for any external damage and faults at least once per shift! 

If any safety-relevant changes must be made to the machine or its working manner, the 
machine must first be brought to an immediate standstill and the fault reported to the per-
son responsible! 

3.  Do not make any modifications, add any attachments or make any conversions to the 

machine that would not guarantee the safety, without consultation with the supplier! This 
also applies to fitting unchecked “safety equipment”! 

4.  Spare parts must comply with the manufacturer’s technical requirements. This is always 

ensured with original PFT parts! 

5.  Only trained or instructed personnel may use the machine. The responsibility for person-

nel who are operating, tooling, maintaining and servicing the machine must be clearly es-
tablished! 

6.  Any personnel who are to be trained, taught, instructed or generally trained must be used 

under on the machine under the supervision of an experienced person! 

7.  Work on the electrical equipment of the machine may only be carried out by an electrician 

or by instructed persons under the supervision of an electrician, in accordance with elec-
tro technical regulations. 

8.  Switch-on and switch-off processes, control displays must be observed in accordance 

with the operating instructions. 

9.  If the machine is completely switched off for maintenance and service work, it must be 

secured against any unexpected restarting (e.g. lock the main switch and remove the key 
or attach a warning sign to the main switch). 

10.  Prior to cleaning the machine with the water jet, all the openings must be sealed, so that 

no water can penetrate (electromotor and switch cabinets) for safety and function rea-
sons. After cleaning, remove the coverings completely. 

11.  Use only the original fuses with stipulated current! 
12.  If work is necessary on the live parts, a second person must be called upon who can 

break the current in the event of an emergency. 

13.  Even with a slight change in location, the machine must be interrupted from any external 

energy supply. Prior to restarting, the machine must again be properly connected to the 
mains. 

14.  The machine must be set up in a safe manner and secured against any undesired move-

ment. 

15.  The pipelines must be laid safely and not around sharp edges! 

16.  Prior to opening the pipeline connection, a depressurised state must be achieved! 
17.  When remedying blockages, the person clearing the block must position him/herself in 

such a way that any escaping mortar cannot hit him/her. Protective goggles must also be 
worn. Other persons may not be situated in close vicinity to the machine!

  

18.  If a continuous pressure level of 85 dB(A) is exceeded, a suitable sound insulation 

means must be provided. 

19.  When spraying, if necessary, suitable personal protection must be worn: protective gog-

gles, protective clothing, gloves, possibly skin cream and breathing protection. 

20.  The machine must be checked by a specialist as and when required, however at least 

once per year. 

 

 

 

 

 

Summary of Contents for HM 6 FU 230V HYMIX

Page 1: ...OPERATING INSTRUCTIONS BAL NR 00 05 41 39 PFT HM 6 FU 230V HYMIX WE KEEP THINGS MOVING...

Page 2: ...ompany The PFT HM 6 is state of the art It has been designed in such an easy to use manner to provide you with a true assistant in the tough building site conditions These operating instructions shoul...

Page 3: ...Initial inspection after delivery An indispensable task of all fitters who deliver the PFT HM 6 is to check the machine settings after the initial starting up The plant settings can change during the...

Page 4: ..._______________ Knauf PFT GmbH Co KG Telephone 09323 31 760 PO Box 60 Fax 09323 31 770 D 97343 Iphofen Internet www pft de _____________________________________________________________________________...

Page 5: ...____________________________________________________________________________ Knauf PFT GmbH Co KG Telephone 09323 31 760 PO Box 60 Fax 09323 31 770 D 97343 Iphofen Internet www pft de ________________...

Page 6: ...x 09323 31 770 D 97343 Iphofen Internet www pft de _______________________________________________________________________________________ 1 Motor protection control transformer 11 Connection motor ca...

Page 7: ...rocessing guidelines The operating instructions give the following names and signs to particularly important information INFORMATION Special information referring to the efficient use of the machine A...

Page 8: ...trician or by instructed persons under the supervision of an electrician in accordance with elec tro technical regulations 8 Switch on and switch off processes control displays must be observed in acc...

Page 9: ...cing valve 1 9 bar at 1000 l h maximum opening Power connection In accordance with VDE conditions connect the machine only to an assembly for con struction site with stipulated FI safety switch Use po...

Page 10: ...following procedure must take place Open the silo flap Switch on the PFT HM 6 using the green ON switch Regulate the water quantity on the needle valve Set the rev counter control to the desired mixin...

Page 11: ...ial in the mixing tube Water isn t running Machine won t start up Water Solenoid valve hole in the membrane is blocked Inspect and remedy the fault Magnetic coil is faulty Pressure reducing valve is t...

Page 12: ..._________________________________ _______________________________________________________________________________________ Knauf PFT GmbH Co KG Telephone 09323 31 760 PO Box 60 Fax 09323 31 770 D 97343...

Page 13: ..._______________________________________________________________ ATTENTION Maintenance and assembly work may only be carried out when the machine is without power interrupt the power supply Cleaning Wi...

Page 14: ...T HM 6 shall again mix normally Measures in the event of a danger of frost In the event of a danger of frost the water fitting of the PFT HM 6 must be emptied To do this depressurise the water supply...

Page 15: ..._______________________________________________________________________________________________ _______________________________________________________________________________________ Knauf PFT GmbH C...

Page 16: ..._______________________________________________________________________________________________ _______________________________________________________________________________________ Knauf PFT GmbH C...

Page 17: ...____________ _______________________________________________________________________________________ Knauf PFT GmbH Co KG Telephone 09323 31 760 PO Box 60 Fax 09323 31 770 D 97343 Iphofen Internet www...

Page 18: ...__________________________________________________________________________________________________________ _______________________________________________________________________________________ Knauf...

Page 19: ...______________________________ Pos Pcs Article no Article description 1 1 20 54 57 01 Drive pin jaw HM3 HM5 25mm hole mi 2 1 20 20 96 03 Threaded pin with hexagon screw M8 x 20 DIN 916 3 1 20 54 57 02...

Page 20: ...__________________________________________________________________________________________________________ _______________________________________________________________________________________ Knauf...

Page 21: ...x4 with 24 holes 9 1 00 05 50 58 Seal for motor flange 10 1 20 10 10 10 Folding split pin D 4 5 with ring 11 1 00 03 99 56 Mixing tube HM 6 RAL2004 12 3 20 20 99 21 Flanged nut M16 DIN 6331 galvanised...

Page 22: ...____________________________________________________________________________________________________________ _______________________________________________________________________________________ Kna...

Page 23: ...20 10 10 10 Splint D 4 5 with ring 12 2 00 05 81 34 Hinged bolt for HM 6 galvanised 13 1 00 03 92 86 Fitting block red metal DK 06 FN 1 2 E 14 1 00 04 04 26 Regulator valve insert complete red metal...

Page 24: ...____________________________________________________________________________________________________________ _______________________________________________________________________________________ Kna...

Page 25: ...O 10 1 00 04 26 02 Motor safety switch 10 16A PKZM 0 16 P 11 2 00 05 35 33 Insulated material for motor safety switch 12 1 00 05 35 79 Lock for switch cabinet Tommy grip 13 1 00 00 24 69 CEE connector...

Page 26: ...nt consumption 6 35 A Number of revolutions 280 min 1 Dims Length of everything 2005 mm Width of everything 330 mm Total weight ca 150 kg Power connection Three phase 230 V 50 Hz 16 A Supply 5 x 2 5 m...

Page 27: ..._______________________________________________________________________ PFT HM 6 FU 230V HYMIX 25 Technical data Status 11 2004 ________________________________________________________________________...

Page 28: ...WE KEEP THINGS MOVING Knauf PFT GmbH Co KG Postfach 60 D 97343 Iphofen Einersheimer Stra e 53 D 97346 Iphofen Telephone 0 93 23 31 760 Fax 0 93 23 31 770 Email info pft iphofen de...

Reviews: