PFT Horizontal Screw Mixer LOTUS XS Overview – Operation
Contents
2019-11-07
3
1
EC Declaration of Conformity ..................... 5
2
Examination .................................................. 6
2.1 Examination by machine operator ........... 6
2.2 Periodic inspection ................................... 6
3
General information ..................................... 7
3.1 Information regarding the operating
manual ................................................. 7
3.2 Keep the manual for later use.................. 7
3.3 Layout ...................................................... 7
3.4 Spare parts lists ....................................... 7
4
Technical data .............................................. 9
4.1 General specifications ............................. 9
4.2 Connection values for water .................... 9
4.3 Operating requirements ......................... 10
4.4 Sound power level ................................. 10
4.5 Vibrations ............................................... 10
5
Dimensions ................................................. 10
6
Dimensional drawing machine standing
. 11
6.1 Type plate .............................................. 11
7
Quality control sticker ............................... 11
8
Design LOTUS XS ...................................... 12
8.1 Overview LOTUS XS 230V .................... 12
9
Subassemblies ........................................... 13
9.1 Material hopper with frame .................... 13
9.2 Mixing tube ............................................. 13
9.3 Mixing shaft ............................................ 13
9.4 Water manifold ....................................... 13
10
Description of assemblies ........................ 14
10.1 Overview of the water manifold ........... 14
11
Connections ............................................... 15
11.1 Electrical connection ............................ 15
11.2 Water connection ................................. 15
12
Accessories ................................................ 16
12.1
Necessary accessories
........................ 16
12.2
Recommended accessories
................. 16
13
Brief description ......................................... 17
14
Material ........................................................ 17
14.1 Areas of application .............................. 17
15
Safety regulations ...................................... 18
16
Transport, packaging and storage ........... 18
16.1 Safety instructions for transport ........... 18
16.2 Transport checklist ............................... 19
16.3 Transport in individual parts ................. 19
16.4 Transportation of machines already
operating ............................................ 19
17
Packaging .................................................... 20
18
Operation ..................................................... 20
18.1 Safety ................................................... 20
19
Preparation of the machine ....................... 21
20
Adjusting the height of the support feet .. 22
20.1 Mains voltage connection ..................... 22
20.2 Water supply connection ...................... 22
20.3 Water from a water barrel ..................... 23
21
Setting the water factor ............................. 23
21.1 Presetting the water flow rate ............... 23
22
Putting the machine into operation .......... 24
22.1 Hazardous dust .................................... 24
22.2 Switching on the machine .................... 24
23
Applying mortar .......................................... 25
24
Interruption of work ................................... 25
25
Cleaning ...................................................... 25
25.1 Securing against restarting................... 25
25.2 Switching off the machine .................... 26
25.3 Removing the mixing tube .................... 26
25.4 Cleaning the mixing tube and mixing
shaft .................................................... 27
25.5 Cleaning the material hopper ............... 27
25.6 Cleaning the dosing shaft ..................... 27