PFT Horizontal Screw Mixer LOTUS XS Overview – Operation
Maintenance tasks
2019-11-07
35
31.3 Maintenance plan
The next sections describe the maintenance tasks required for
optimal, problem-free operation.
Provided no increase wear can be identified during regular
inspections, reduce the required maintenance intervals as
appropriate for the actual signs of wear.
For questions regarding maintenance tasks and intervals, contact
the manufacturer (see service address on page 2).
Interval
Maintenance task
To be performed by
Daily
Clean/replace the dirt trap sieve in the water inlet
Operator
32 Maintenance tasks
32.1 Dirt trap sieve
Fig. 47: Dirt trap sieve in the water inlet
Check the dirt trap sieve in the water inlet on a daily basis:
1. Remove the dirt trap sieve from the Geka coupling.
2. Clean the dirt trap sieve.
3. Replace the sieve if dirt is severe.
4. Replace the dirt trap sieve
.
Dirt trap sieve for Geka coupling:
Item number 20152000
Performed by operator.
32.2 After performing maintenance
After maintenance has been completed, carry out the following steps
before switching on.
1.
Check that all previously loosened screw connections have a
tight fit.
2.
Check that all previously removed protective devices and
covers have been properly reattached.
3.
Ensure that all tools, materials and other equipment have been
removed from the work area.
4.
Clean the work area and remove any traces of escaped material
(e.g. liquids, processing material etc.).
5.
Ensure that all safety devices are functioning properly.