___________________________________________________________________________________________________________
PFT N2V/N2 FU 400V
15
N2V start-up
12/2004
___________________________________________________________________________________________________________
_______________________________________________________________________________________
Knauf PFT GmbH & Co.KG
Tel.
+49 (0) 9323/31-760
Postfach 60
Fax
+49 (0) 9323/31-770
D-97343 Iphofen
Internet
www.pft.de
_______________________________________________________________________________________
N2V start-up
Connect the power connection (1) to the power supply (1) 400 V, 32 A fuse with
FI safety switch 30 mA
Pull the dummy plug (2)
Connect the pump motor
Connect the mortar pressure gauge
Connect the material hose to the mortar pressure gauge
Fill the material hopper with mortar
Set the speed to minimum
Main reversing switch
ON
Operation (1)
ON
Plug in blind plug (2), machine runs
or connect remote control
and
Open tap (1)
Switch on the machine using remote control (2)
2
2
1
1
1
2
2
1