Part 2 EC Declaration of Conformity Overview – Operation
End of shift / Cleaning
54
2020-03-25
55.3 Checking the mortar pressure
The machine must be cleaned daily after work and before
prolonged pauses.
5
4
3
Fig. 92: Mortar pressure at 0 bar
To switch off the machine:
1. Turn the selector switch (1) to the “Zero” position
(middle position).
2. Turn the main switch (2) to the position “0”.
3. Check the mortar pressure gauge (3) to see if the pressure
has fallen to “0 bar”.
DANGER!
Overpressure on the machine!
When opening machine components, these can
fly open in an uncontrolled manner and injure
the operator.
Only open the machine if the pressure has fallen
to 0 bar.
NOTE!
The mortar hoses and spray gun must be cleaned
immediately at the end of work.
4. Release cam lever (4) and uncouple mortar hose (5) from
the mortar pressure gauge (3).
5. Only uncouple the air hose from the spray gun.
55.4 Cleaning the mortar hose
Fig. 93: Connecting the cleaner coupling
1. Connect the cleaner coupling (1) to the water outlet valve (2).
2. Press the water-soaked sponge ball (3) into the mortar hose (4).
3. Connect mortar hose (4) with the sponge ball to the
cleaner coupling (1).
2
1
2
1
3
4