Mixing pump RITMO L plus FC-230V Overview – Operation
Packaging
30
2020-11-09
29.6 Transport by car
Fig. 49: transport
DANGER!
Risk injury due to unsecured load!
All persons involved in the loading are responsible
for securing the load properly during road
transport. The relevant vehicle driver is
responsible for the operational loading.
29.7 Transportation of operational machines
DANGER!
Danger of injury due to leaking mortar!
Injury to the face and eyes can occur.
Therefore:
Make sure all hoses are depressurised before
opening the couplings (note the indicator on
the mortar pressure gauge).
1. Carry out the following steps before transporting:
2. First unplug the main power cable.
3. Detach all other connected cables.
4. Remove the water supply lines.
5. Begin transport.
6. Remove loose parts during crane transport.
30 Packaging
Packaging information
Individual packages are packed according to the applicable
transportation requirements. Only environmentally-friendly
materials were used for the packaging.
The packaging is intended to protect individual components from
harm during transportation, corrosion and other damage up to the
point of assembly. Do not destroy the packaging and only remove
it shortly before assembly.
Provided no agreements for the return of the packaging have been
made, separate the materials according to type and size and reuse
or recycle them accordingly.