Mixing pump RITMO XL 400V Overview – Operation
Transport, packing and storage
2019-12-11
19
13.2 Transport inspection
Immediately after receipt, check to ensure that the delivery
is complete and free of transport damages.
Proceed as follows if there are externally identifiable
transportation damages:
Do not accept delivery or accept delivery only under
reservation.
Mention the scope of damage on the transport
documents or on the delivery receipt of the transport
agency.
NOTE:
Complain about each defect as soon as it is
detected. Damage claims can be filed only
within the valid complaint periods.
13.3 Transport in single parts
Fig. 23
: Open rotation lock
Fig. 24
: Mixing pump unit
1.
For easier transportation, dismantle
the machine into its individual parts.
2.
Detach the units mixing tube with
material container and pump, geared
motor
with
tilt
flange
and
undercarriage.
3.
Detach cable- and hose connections.
Open the rotation lock (Fig. 23:).
Remove the mixing tube with material
container from the undercarriage.