Mixing Pump RITMO XL FU 230/400 reversible Overview – Operation
Monitoring the machine
2019-05-13
39
35 Monitoring the machine
DANGER!
Access by unauthorised persons!
The machine must be operated only if
monitored.
36 Operating the machine
36.1 Checking mortar consistency
Fig. 52: Consistency checking tube
1. Connect the consistency checking tube to the mortar
pressure manometer.
2. Place a basket or tub under the consistency checking
tube.
Article No. 20104301 Consistency checking tube 25M-
section.
36.2 Switching on the RITMO L plus with material
Fig. 53: Switching on
1. Turn main reverse switch (1) to position "I".
2. Press the green pushbutton Control voltage "ON" (2).
3. Put sack contents in the material container.
NOTE:
During the first filling with sack contents, let
half of the half the first sack trickle down
slowly into the material container!
4. Turn selector switch pump motor (3) to the right.
Fig. 54: Check material consistency
5. Check material consistency at consistency inspection
tube.
Fig. 55: Switching off
6. Switch off machine at selector switch (3) (middle position).
7. Remove consistency inspection tube and clean.
1
2
3
3