3)76:,1*
*%
,QLWLDO2SHUDWLRQ
9HUVLRQ
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
________________________________________________________________________________________
6HWWLQJ8SWKH0DFKLQH
-
Transport all machine components as close as possible to construction site
(for assembly see
7UDQVSRUW
page 5 08 00 411)
-
Connect the gear motor to the control box (1)
-
Connect the control box to the mains (2), 230V, fuse protection 16A, with
IDXOW
FXUUHQWFLUFXLWEUHDNHUP$
:RUNLQJZLWK3DLQW5ROO6HWIRU6:,1*
-
Disconnect dummy plug from control box
-
Connect remote control cable, switch OFF
-
Connect mortar pressure gauge
-
Screw the paint roller on the telescopic conveying rod
-
Connect material hose with mortar pressure gauge and telescopic conveying rod
-
Fill material container with paint
-
Set speed to Minimum
-
Push green
21EXWWRQ
-
Control light is on
-
Turn selector switch to “forward” position
- Open ball tap on telescopic conveying rod
-
Switch the machine on by remote control
:$51,1*
When interrupting your work, always first switch off the machine with the aid of the
remote control, then close the ball tap on the telescopic conveying rod.