3)76:,1*
*%
,QLWLDO2SHUDWLRQ
9HUVLRQ
BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
________________________________________________________________________________________
:RUNLQJZLWK'LVSHUVLRQ3DLQW6SUD\LQJ6HWIRU3)76:,1*,,
-
Disconnect dummy plug
-
Connect mortar pressure gauge
-
Connect material pressure hose with mortar pressure gauge and paint gun
-
Connect PVC fabric hose with EWO coupling to compressed-air connection on
control box and paint gun
-
Connect compressor with air pipe to control box
-
Separately connect compressor to power supply and switch it on; wait until
pressure has built up in the air hose
-
Fill hopper with paint or similar materials
-
Set speed to Minimum
-
Push green
21EXWWRQ
-
Control light is on
-
Turn selector switch to “forward” position
-
Open ball tap on telescopic conveying rod
-
Switch on machine on by remote control
-
When pulling the trigger of the paint gun, the air nozzle is opened first. The air
flowing out then activates the flow detector, which, in turn, switches the pump
motor on.
:$51,1*
Leave the speed at the lowest setting, because otherwise the conveying pressure in
the material hose will be too high.