)LUVW,QVSHFWLRQDIWHU'HOLYHU\
It is mandatory that all technicians delivering the conveying pump
3)76:,1*,,
check
the machine settings at the end of the first spraying operation. Factory settings may
change during the initial operation. If these changes are not corrected in time, i.e. right
after the running-in period, malfunctions are likely to occur.
On principle, every delivery technician has to carry out the following inspections or
settings after handing over the conveying pump
3)76:,1*,,
and giving the
necessary instructions, i.e. after about two hours of operation:
1. Air flow detector
2. Pump pressure, back pressure
3. Remote control switch