PFT
Conveying Pump SWING L
Overview – Operation
– Spare Parts Lists
Processing ma
14/09/2021
33
1
Fig. 39:
Switch on the SWING L FU
Fig. 40: Switch on SWING L, pole-
changing
Fig. 41:
Open the air cock
1. Switch on the SWING L FU (Fig. 39), turn the selector switch (1)
to the right.
2. Switch on the SWING L (Fig. 40), press the green push button (2)
(control voltage "ON").
3. Hold the sprayer in the direction of the wall to be plastered.
4. Make sure that there are no people in the area where the sprayer
is discharged.
5. Open the air cock (3) on the sprayer.
6. If the pressure switch-off is used, the machine starts up
automatically via the pressure switch-off and the mortar emerges
from the spraying device.
NOTE!
The correct mortar consistency is reached, if the
material mixes on the surface to be sprayed (we
recommend application on wall surfaces from top to
bottom). If the water quantity is too little even mixing
and spraying is no longer guaranteed; blockages
may form inside the hose and high wear of the pump
parts will become an issue.
34.2 Speed controller
1
Fig. 42: Speed controller
1. The quantity of material can be regulated through the speed
controller (1).
NOTE!
Only SWING L FU 400V and SWING L FU 230V
.
2
3