PFT
Conveying Pump SWING L
Overview – Operation
– Spare Parts Lists
Periodic insp
14/09/2021
53
44.8 Measures after effected maintenance
44.9
After finishing the maintenance works and prior to switching on the
machine, the following steps have to be carried out:
Check all previously loosened screw connections for secure fit.
Check if all previously removed safety systems and covers are
properly reinstalled.
Ensure that all used tools, materials and other equipments were
removed from the work area.
Clean the work area and remove any spilled materials such as
liquids, processing material or similar.
Ensure that all safety systems of the installation work perfectly.
45 Periodic inspection
Construction machinery has to be inspected for their safe working
condition in accordance with the operating conditions and the
operational requirements as needed, however at least once a
year by an expert.
Pressure vessels have to undergo the prescribed expert
inspections.
The inspection results have to be documented and kept at least
until the next inspection.
This heading contains test suggestions for the annual inspection by a specialist according to BGR 183 for
the SWING L.
Knauf PFT - Downloads - Datenblätter
DOCUMENT CENTER
Use our wizard to find specific
downloads
Expert examination
Select your preferred language for
downloads
All languages
Search for downloads
Search
SEARCH RESULT
Designation
Status
Document type
SP15 SWING L
Apr. 2016
Expert examination