PFT Conveying Pump ZP 3 XL MIX Part 2 Overview – Operation - Spare Parts Lists
Transport, Packaging and Storage
Fehler! Formatvorlage nicht definiert.
17
5.2 Transportation Inspection
Upon receiving delivery, check it immediately for completeness
and transportation damages.
In case of externally visible transportation damages, proceed as
follows:
Do not accept the delivery or accept it only with reservation
Remark the scope of damage on transportation documents or
on the delivery note of the transporting company.
Initiate complaint.
HINT!
Complain about every defect as soon as it is
detected. Claims for compensation of damages can
be raised only within the period set forth for lodging
a complaint.
5.3 Transportation
Hoisting points
Fig.16: Hoisting points
For transportation by means of a crane, hoist the pump with a rope
at the hoisting eyelets (1).
Note the following conditions:
Crane and hoisting means must be dimensioned for the weight
of the packaged pieces.
The operator must be qualified to operate the crane.
Hoisting:
1.
Tie the ropes or belts appropriately.
2.
Guarantee that the packaged piece hangs straight, if
necessary note the asymmetrical centre of gravity.
Transporting a Machine that is
Already in Operation
DANGER!
Risk of Injury by Discharged Mortar!
Face and eyes can be injured.
Therefore:
– Prior to opening the couplings, ensure that the
hoses are not pressurised (observe the mortar
pressure manometer).
Fig.16a:
Secure
1. Please observe before transport:
2. Disconnect the cable of the main current
3. Loosen all further cable connections
4. Remove loose parts, such as compressor, before transport
5. During transport on a car trailer or truck please fasten the
plastic cover with a tension belt
6. Start
transport
1
5