ON-LINE 3P/3P
PH 9283 - PH 9284 .
2.2. Setup the UPS
Step 1.
Make sure the mains wire and breakers in the building are enough for the rated
capacity of UPS to avoid the hazard of electric shock or fire.
Note: Do not use the wall receptacle as the input power source for the UPS, as its rated current is
less than the UPS‟s maximum input current. Otherwise the receptacle may be burned and
destroyed.
Step 2.
Switch off the mains switch in the building before installation.
Step 3.
Turn off all the connected devices before connecting to the UPS.
Note 1: The cable for 30K/30KL should be able to withstand over 60A current. It is recommended to
use 8 AWG or
thicker wire for Phase and AWG 8 or thicker wire for Neutral for safety and efficiency.
Note 2: The cable for 40K/40KL should be able to withstand over 80A.current. It is recommended to
use AWG 10 or thicker wire for Phase and 6 AWG.or thicker wire for Neutral for safety and
efficiency.
Note 3: The selections for color of wires should be followed by the local electrical laws and
regulations.
Step 4.
Remove the terminal block cover on the rear panel of UPS. Then connect the
wires according to the following terminal block diagrams: (Connect the earth wire first
when making wire connection. Disconnect the earth wire last when making wire
disconnection!).
Terminal Block wiring diagram for 30K/40K
73 / 100