5. Operation Process
•
System Initialization
•
User Authorization
•
Plug in DC Charging Connector
•
Preparing for Charging
•
In Charging
•
Charging Terminated
•
Status Messages
5.1 Operating Sequence
•
When the charger is powered on, it start with the
“
Charging Station
”
Initializing
page.
•
You will see the below image on the screen after powering on and the system is
initializing.
•
The initializing process will take around 2 minutes, then shows home page.
5.2 Operating Procedure
5.2.1 System Initialization
Initializing page
25
Summary of Contents for DC EVSE 60KW
Page 2: ......
Page 10: ...2 5 Direction of cooling Airflow Air Out Air In 7 ...
Page 15: ...Remove these 4 pcs of fixing M12 screws STEP 3 12 ...
Page 55: ...52 NOTE ...
Page 56: ...NOTE ...
Page 57: ...NOTE ...
Page 58: ...Manufacturer Contact Info Sticker www phihong com tw ...