1-9-1
H9924EA
ELECTRICAL ADJUSTMENT INSTRUCTIONS
General Note: "CBA" is an abbreviation for
"Circuit Board Assembly."
NOTE:
1.Electrical adjustments are required after replacing
circuit components and certain mechanical parts.
It is important to do these adjustments only after
all repairs and replacements have been com-
pleted. Also, do not attempt these adjustments
unless the proper equipment is available.
2.To perform these alignment / confirmation proce-
dures, make sure that the tracking control is set in
the center position: Press either "CHANNEL
L5??
" or
"CHANNEL
K
" button on the front panel first, then
the "PLAY" button on the front panel.
Test Equipment Required
1.Oscilloscope: Dual-trace with 10:1 probe,
V-Range: 0.001~50V/Div.,
F-Range: DC~AC-20MHz
2.Alignment Tape (9965 000 14514)
Head Switching Position Adjustment
Purpose:
To determine the Head Switching position during
playback.
Symptom of Misadjustment:
May cause Head Switching noise or vertical jitter
in the picture.
Reference Notes:
Playback the Alignment tape and adjust VR501 so that
the V-sync front edge of the CH1 video output wave-
form is at the 6.5H
±
1H (416
µ
s
±
64
µ
s) delayed position
from the rising edge of the CH2 head switching pulse
waveform.
Test point
Adj.Point
Mode
Input
TP751(V-OUT)
TP504(RF-SW)
GND
VR501
(Switching Point)
(MAIN CBA)
PLAY
(SP)
-----
Tape
Measurement
Equipment
Spec.
9965 000 14514
Oscilloscope
6.5H
±
1H
(416
µ
s
±
64
µ
s)
Connections of Measurement Equipment
Oscilloscope
Main CBA
TP751
CH1 CH2
Trig. (+)
GND
TP504
Figure 1
EXT. Syncronize Trigger Point
1.0H
CH1
CH2
Switching Pulse
V-Sync
0.5H
6.5H
±
1H (416
µ
s
±
64
µ
s)
Summary of Contents for DVP3050V/75
Page 12: ...1 6 1 H9923IB OPERATING CONTROLS AND FUNCTIONS ...
Page 13: ...1 6 2 H9923IB ...