background image

GC6103

6-6

REPAIR INSTRUCTIONS

-  Due to the high wattage of the iron, only the specified cord set must be used.
-  Should damage be observed on the 

HOSE-CORD ASSY 40

 or 

POWER CORD 41

, they must be replaced. 

Continued usage is not allowed.

 When 

replacing 

HOSE-CORD ASSY 40

, it is 

IMPORTANT

 to ensure that the white silicon sleeve is held tightly by the 

cord clamp.  Below picture shows the correct position of the silicon sleeve with respect to the cord clamp.
Do also ensure that the orientation of the cord clamp is correct i.e. such that the round end is on the left & the flat end is on the 
right, as shown in the picture.

White silicon sleeve

Flat edge to be always 
on the cord side

Cord clamp

Cord

Hose

-  After the product has been repaired, it should function properly and has to meet the safety requirements & legal regulations as 

laid down & officially established at this moment.

-  The following tests are common checks that are conducted on a repaired product before it is returned to the consumer.

1. 

Soleplate temperature

Check that soleplate temperature is within IEC requirement.

Measure the temperature of the soleplate after the iron has reached steady state i.e connected to the mains for at least 15 minutes. 
The table below shows the temperature requirement.

Marking

Soleplate temperature (Deg C)

Material, for example

Test-
point

==

Minimum Maximum N Tolerance

 

(1 dot)

  70

120

  95 ± 25

Acetate, elastane, polyamide, polyproylene

••

 

(2 dots)

100

160

130 ± 30

Cupro, polyester, silk, triacetate, viscose, wool

•••

 

(3 dots)

140

210

175 ± 35

Cotton, linen

2. 

Leakage current

Check that leakage current is within IEC requirement.

Measure leakage current between LIVE/NEUTRAL & EARTH.
IEC requirement is that at 230 V supply, the EARTH leakage current must be less than 0.75 mA.

3. 

Water leakage / Functionality

Check that there is no water leakage from any part of the product during operation.

Check that the functionality of the product (product dependent) eg. steaming, variable steam, SOS, ASO etc is working properly.

4. 

Loose part

Check that there are no loose parts eg. extra screw in the product that can cause short-circuit or product malfunction.

Summary of Contents for GC6103

Page 1: ...ight switch Safety Information This product meets the requirements regarding interference suppression on radio TV Due to the high wattage of the iron only the specified cord set must be used After the product has been repaired it should function properly and has to meet the safety requirements legal regulations as laid down officially established at this moment TECHNICAL INFORMATION Voltage 230 V ...

Page 2: ...OLEPLATE MTD ASSY 17 Remove screw A Disassemble BACKPLATE 5 Disassemble INLAY 6 Disassemble TEMPERATURE DIAL 1 Remove screw C 2x Disassemble IRON HANDLE 13 Remove screw D 3x Disassemble IRON COVER 16 Hose cord Assembly Connections Hose Cord Blue Yellow Green Brown Yellow Green Blue White Brown Yellow Electrical Diagram Boiler Heating Element Boiler Switch Iron Switch Thermo fuse Thermo fuse Iron H...

Page 3: ...510 4239 022 55520 Temperature dial Thermostat bush Sliding probe Sound spring Backplate Inlay Steam knob Fix piece Steam knob spring Iron lamp assy Pos Service code Description 11 12 13 14 15 16 17 18 19 4239 022 55410 4239 022 55500 4239 022 55390 4239 022 55440 4239 022 55490 4239 022 55340 4239 022 55360 4239 022 55460 4239 022 55070 Iron lamp cover Microswitch Iron handle Swivel Small termina...

Page 4: ...e When replacing HOSE CORD ASSY 40 please refer to IMPORTANT directives in the REPAIR INSTRUCTIONS on page 6 Pos Service code Description 20 21 22 23 24 25 26 29 30 31 34 4239 022 55630 4239 022 55640 4239 022 55560 4239 022 55550 4239 022 55650 4239 022 55660 4239 022 55570 4239 022 55600 4239 022 55840 4239 022 55720 4239 022 55850 Silicon cap A Silicon cap B Heat insulation plate Top cover Whit...

Page 5: ...GC6103 5 6 EXPLODEDVIEW BOILER STAND 20 23 35 37 38 34 24 31 25 40 43 41 E 4x F 4x J 3x G 5x 21 42 36 39 36 26 22 29 30 47 ...

Page 6: ...efore it is returned to the consumer 1 Soleplate temperature Check that soleplate temperature is within IEC requirement Measure the temperature of the soleplate after the iron has reached steady state i e connected to the mains for at least 15 minutes The table below shows the temperature requirement Marking Soleplate temperature Deg C Material for example Test point Minimum Maximum Nominal Tolera...

Reviews: