Test and Inspection Matrix
2
-
6
Performance Verification and Safety Tests
Safety Tests
Indicate test results as
follows:
Note: All Safety tests include
both Normal and Reverse
Polarity conditions.
Earth Leakage
Current (S1)
(Required only
when AC Power
module is used.)
Earth Leakage Current NC
(Normal Condition)
If NC maximum leakage
current:
< 300 uA (UL), <500 uA
and
Example: S1:p/200/300
Earth Leakage SF
(Single Fault - open neutral)
If SF maximum leakage
current:
< 1000 uA
then S1 test passes
Patient Lead
Leakage (S3)
(Required only
when AC Power
module is used.)
S3:p/aa/bb/cc/dd/ee/ff/ggg/
hhh/iii
Example: S3:p/9/49/49/10/
50/50/100/499/750
ECG Patient Cable
If readings are as expected:
•
Source
(Normal Condition) - aa
•
< 10 uA
•
Source (Single Fault
Condition - open earth,
open neutral) - bb
•
< 50 uA
•
With Mains on applied part
(Single Fault condition) - cc
•
< 50 uA
then Safety Patient Lead
Leakage test passes
SPO
2
If readings are as expected:
•
Source
(Normal Condition) - dd
•
< 10 uA
•
Source (Single Fault
Condition - open earth,
open neutral) - ee
•
< 50 uA
With Mains on applied part
(Single Fault condition) - ff
•
< 50 uA
then Safety Patient SPO2
Leakage test passes.
Table 2-1 Performance Verification and Safety Tests (Continued)
Test Group Name
Test or Inspection to
Perform
Expected Test Results
Data to Record
P (pass) or F (fail)
Summary of Contents for Heartstart XLT
Page 1: ...H E A R T S TA R T X LT S e r v i c e M a n u a l M 3 5 0 0 B M 5 5 0 0 B ...
Page 2: ......
Page 3: ...Service Manual M3500B HeartStart XLT M5500B Heartstart 4000 Defibrillator Monitor ...
Page 6: ......
Page 16: ......
Page 20: ......
Page 52: ......
Page 216: ......
Page 223: ......
Page 224: ...M3500 90900 Printed in USA February 2003 Second Edition M3500 90900 2 ...