background image

Parts list stand

pos

description

service code

HI980

HI984

30
30.1
31
32

cap + safety valve
Sealing
tray
cover stand

4822 462 10895
4822 466 11489
4822 418 10243
4822 442 00789

x
x
x
x

x
x
x
x

33
34
35
36

rubber distance piece
rubber buffer
housing stand
boiler complete HI980

4822 325 71999
4822 466 11398
4822 441 11914
4822 218 11596

x
x
x
x

x
x
x

-

37
38
39

boiler complete HI984
steam hose ( black ) HI984 “Y - Y”
steam hose ( red ) HI980

“Z - Y”

cordset Euro, colour black

4822 218 11597
4822 530 10378
4822 530 10379
4822 321 11291

-
-

x
x

x
x

-

x

40
41

cordset Italy, colour black
cordset UK, colour black
switch(es) boiler
manometer

4822 321 11292
4822 321 11293
4822 276 13848
4822 349 11023

x
x
x

-

x
x
x
x

42
43
44
45

steam control valve
sealing of filling opening
clamping bracket hose
rubber foot

4822 360 10278
4822 532 12773
4822 401 11686
4822 462 10896

-

x
x
x

x
x
x
x

46

pilot light

4822 134 10077

x

x

PARTS LIST + DISASSEMBLY ADVICE STAND

ADJUSTMENT AND CONTROLS

Pressostat 101

The pressostat ( 101 ) fixed to the boiler has already been adjusted.
The adjustment has been secured by glue.

To avoid dangerous situations, NEVER try to adjust or
readjust the pressostat.

IMPORTANT

− When the thermal fuse ( 104 ) is open, the boiler has been

subjected to too high temperatures.

In that case, the complete boiler must be replaced for
safety reasons.

− To avoid leakage of the sealings and damage to the components in

and on the boiler :

Never clean the boiler with vinegar, a descaling agent or
other chemicals

.

When the safety valve, located in the cap ( 30 ), has been
activated, the COMPLETE PRODUCT has to be replaced.

THE COMPLETE BOILER HAS TO BE REPLACED WHEN:

*

the pressostat ( 101 ) doesn’t function properly.

*

the electrovalve ( 103 ) fails or the sieve is soiled with
scale.

*

the thermal fuse ( 104 ), boiler thermostat ( 105 ) or hand
- resettable thermostat ( 106 ) are open, because the
boiler has been subjected to too high temperatures.

When replacing the sealing of filling opening of the boiler
( 43 ), always add silicone pasta suitable for general
purposes.

When the water hardness is higher than 17° DH / 21°
Clarke, it’s advised to use distilled water.

Due to standardisation, only tube 37 “Y - Y” has been
incorporated into the service manual.

Components with numbers from 100 and higher cannot be ordered separarely

BOILER COMPLETE

The boiler complete
consists of:

boiler body
pressostat 101
sieve + electro valve 103
boiler thermostat 105
hand-resettable thermostat 106
fuse 104
sealing of the filling opening 43
pilot light( s ) boiler 46
cap + safety valve 30
electrical wiring

DISASSEMBLY ADVICE
STAND

to open the

STAND

remove

CAP 30

remove

INLAY 31

remove

SCREW K 6x

remove

COVER 32

Summary of Contents for HI 980

Page 1: ...n Voltage 220 240 V Power consumption Boiler 1200 Watts Iron 800 Watts Soleplate temperature Dial at max position 205 25 ºC Features contents boiler 0 9 litre length steam hose 1 7 m length cordset 2 0 m Product meets the requirements regarding interference suppression on radio and TV Published by Philips Domestic Appliances and Personal Care Printed in the Netherlands Copyright reserved Subject t...

Page 2: ......

Page 3: ...4 10076 4822 498 10638 4822 492 71001 4822 532 12742 x x x x x x x x 14 15 16 17 sleeve connect bracket therm metal cover insulating bracket 4822 325 10194 4822 402 10689 4822 442 00788 4822 466 11473 x x x x x x x x 18 19 20 21 sole plate pos 19 thermostat insulating plate bracket item 22 and 23 4822 259 10234 4822 282 30238 4822 466 11474 4822 310 10945 x x x x x x x x 24 hose joint 4822 526 106...

Page 4: ...ve SLEEVE remove CORK GRIP remove SCREW I remove BRACKET 21 turn conductor B through 180 degrees remove PLATE 17 THERMOSTAT 19 ONLY cut CONDUCTOR A at location P remove SCREW J ASSEMBLY REQUIREMENTS THERMOSTAT 19 Instead of metal conductor A the new thermostat has a wire with AMP clamp After fixing screw J connect the AMP clamp to tag Q After assembling cover 16 ALWAYS turn conductor B through 180...

Page 5: ......

Page 6: ...s been subjected to too high temperatures In that case the complete boiler must be replaced for safety reasons To avoid leakage of the sealings and damage to the components in and on the boiler Never clean the boiler with vinegar a descaling agent or other chemicals When the safety valve located in the cap 30 has been activated the COMPLETE PRODUCT has to be replaced THE COMPLETE BOILER HAS TO BE ...

Reviews: