3-4
Chapter 3: Installing and Configuring the ITS
Step 1. Complete the ITS Installation Worksheets.
Photocopy and complete the following ITS installation worksheets provided in
Chapter 2 prior to installing any components:
• “ITS Infrastructure Equipment Summary Table” on page 2-26
• “ITS Access Point Equipment Summary Table” on page 2-26
• “APC Configuration Worksheet” on page 2-29
• “1.4 GHz Default AP Configuration Worksheet” on page 2-32
• “2.4 GHz Default AP Configuration Worksheet” on page 2-33
• “AP Group Configuration Worksheet” on page 2-35
Step 2. Install the ITS Infrastructure Components.
Figure 3-1 shows the suggested order when rack-mounting ITS infrastructure
components.
Note
It is extremely important that you power and interconnect the ITS components only
in the prescribed order. Do not power up an ITS component or connect it to the
network until instructed to do so.
To install, power, and verify operation of the 1.4/2.4 GHz IntelliVue Telemetry
System Infrastructure components:
1. Referring to Figure 3-1, mount the ITS infrastructure components in a standard
19-inch equipment rack:
• Mount the ITS Access Point Controller above the ICN Network Switch.
• Mount the ITS Power over Ethernet unit beneath the ICN Network Switch.
• Mount the ITS Synchronization Unit beneath the ITS Power over Ethernet
Unit and above the UPS.
Figure 3-1: Rack-mounting the ITS Infrastructure Components
Uninterruptible Power Supply
ITS Synchronization Unit
ITS Power over Ethernet Unit
ICN Network Switch
ITS Access Point Controller
Summary of Contents for IntelliVue Telemetry System Infrastructure
Page 8: ...viii Contents ...
Page 14: ...xiv About This Guide ...
Page 100: ...3 22 Chapter 3 Installing and Configuring the ITS Figure 3 10 APC Filter Configuration Screen ...
Page 162: ...5 12 Chapter 5 Troubleshooting and Testing ...
Page 168: ...A 6 Chapter A Installing Multiple ITSs at a Single Hospital Site ...
Page 180: ...Index 8 Index ...