background image

7-7

 

Due to the high wattage of the iron, only the 

 cord set must be used.

 

Should damage be observed on the 

, it must be replaced. 

 

Continued usage is not allowed.

 

If 

 is provided without type plate information eg. Type number, voltage etc.  When replacing the cover, 

engrave the type number & voltage on the type plate with a sharp object.

 

After the product has been repaired, it should function properly and has to meet the safety requirements & legal regulation 
as laid do

ally established at this moment.

 

The following tests are common checks that are conducted on a repaired product before it is returned to the consumer.

Check the soleplate temperature is within IEC requirement.

Soleplate temperature ( Deg C)

Materials, for example

Test-

point

=

=

Minimum

Maximum

Check that leakage current is within IEC requirement.
Measure leakage current between LIVE/NEUTRAL & EARTH.

Check that there is no water leakage from any part of product during operation.
Check that the functionality of the product (product dependent)  eg. Steaming, steam trigger, variable steam, SOS, PCBA 
etc is working properly.

Check that there are no loose parts eg. Extra screws in 

 

When replacing fuse, to also service the water tubes which is probably choked with calc.

All failed PCBAs including to be packed with ESD bags for shipment.

 ned screws in terms of length and material used.

Repair Instruction

The torque of the thermistor-soleplate screw is 9-12kg f.cm. 

230

170

Summary of Contents for SpeedCare GC6625

Page 1: ...k Hose storage Hose storage compartment Cord freedom swivel 180 degree cord freedom Hose length 1 6 m Power cord length 1 8 m Calc management Suitable for tap water Calc clean solution Smart Calc Clean Calc clean reminder Filtered water recommended Safety Information This product meets the requirements regarding interference suppression on radio and TV After the product has been repaired it should...

Page 2: ...emove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Remove Fig 1 Thermistor is part of the Power PBCA Asm ...

Page 3: ...ASSY 42 CORD CLAMP 45 CORD BOX COVER 50 TERMINAL BLOCK 46 SWITCH BRAKET ROCKER SWITCH 47 POWER CORD ASM 52 Remove SCREW CAP 57 Remove Screws A1 A2 Remove SILICON CUSHION 56 Remove INSULATION BASE 55 Remove Screws C1 C2 C3 C4 C5 C6 C7 Remove UNIT BASE COVER 51 Remove BOTTOM FOOT 40 Remove Screws D1 D2 D3 D4 D5 D6 D7 Remove WATER TANK ASM 36 Remove UNIT BASE BODY 43 Remove Screw E1 E2 Remove PUMP BR...

Page 4: ...te assy ber tube Throat clamp Bend connector Throat clip Potentiometer box Cord clamp Dial knob Top cover Cord bushing Power PCB box Power PCB asm Silicon pad Switch hole cover Button Connection wire asm Wire connector Iron base support Pos Service code Description Release button Lock fastener Location fastener Bolt base Water tank asm Seal ring Water tube connector Silicon tube Bottom foot Pump a...

Page 5: ...5 7 A2 A1 E1 H1 H2 H3 H4 E2 C1 D1 F2 F1 G1 G3 B1 G2 16 12 25 2 6 7 26 9 11 5 27 13 28 8 1 3 18 21 20 10 24 4 22 15 23 14 17 19 59 ...

Page 6: ...GC6625 6 7 A2 C1 C2 C6 G1 H1 E1 D1 D2 D4 D5 D3 D6 D8 D7 E2 F1 F2 F4 F3 I1 I2 A1 C3 C5 C7 C4 38 42 44 34 35 36 43 37 41 33 32 31 57 52 55 45 50 49 47 40 46 39 58 51 48 56 Exploded view Stand ...

Page 7: ...mer Check the soleplate temperature is within IEC requirement Soleplate temperature Deg C Materials for example Test point Minimum Maximum Check that leakage current is within IEC requirement Measure leakage current between LIVE NEUTRAL EARTH Check that there is no water leakage from any part of product during operation Check that the functionality of the product product dependent eg Steaming stea...

Reviews: