29
Fasten the strain relieves.
If you intend to use the Excess Energy
Management output, follow these steps:
a.
Remove the green terminal block in the
terminal compartment.
b.
Mount the excess energy signal wires as
shown in the picture beside.
c.
Connect the signal wires to the excess
energy management input of the appropriate
load (e.g. Phocos DCL DC voltage converter
and Phocos BCM DC battery charger).
d.
Reconnect the green terminal block to the
CX.
Some equiptment, like relays, gates or
motors, can damage the CX controller by
magnetic induction, when it switches off.
To prevent this, reverse connect the diode
(such as 1N5401 .. 1N5408) between LOAD +
and LOAD - as shown in the left diagram.
Summary of Contents for CX10
Page 1: ......
Page 2: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......