4
5756B
Preparations
This section contains the basic settings which are necessary
before installing the controller board in the PLC and which
determine the operating behavior.
ESD Regulations
Persons who handle the controller board must protect
it by observing the ESD instructions before packing or
unpacking the board, opening control boxes or control
cabinets and before touching the board.
Unpacking the Controller Board
The controller board is supplied together with a package slip
with installation instructions. Please read the complete
installation instructions before unpacking the controller board.
Only qualified persons should pack, unpack and
handle the controller board while observing the ESD
instructions.