background image

 

 

 

 

 

 

 

 

 

 

 

 

ID

50

0

IS

50

0

ID

60

1

IS

60

1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ID

70

1

ID

80

0

IU

P7

01

IU

P8

00

IS

70

1

IS

80

0

UL 

Cla

sifi

cad

o  A

ero

coo

l In

dus

tria

l / 

Com

erc

ial

 E

nfr

iad

or 

Eva

por

ativ

o M

anu

al d

e U

so 

y C

uia

do 

  7

Le

ye

nd

a

1.

Su

je

ta

do

re

s d

el 

co

rd

ón

 d

e l

a b

om

ba

 (s

iti

os

 

ap

ro

xim

ad

os

).

2.

Ca

ja

 d

em

pa

lm

de

 b

om

ba

 (J

BK

11

JB

K2

30

). 

In

sta

la

rla

 e

n d

on

de

 lo

 in

dic

a l

a c

alc

om

an

ía

 q

ue

 d

ic

“L

oc

ate

 J

-b

ox

 h

ere

” u

sa

nd

o lo

s a

gu

je

ro

s e

n la

 c

aja

 y

 lo

to

rn

ill

os

 d

e b

ro

ca

.

3.

Co

nd

uc

to

 p

ort

ca

ble

ala

mb

ra

do

 d

la

 c

aja

 d

em

pa

lm

e a

l s

um

in

is

tro

 d

e c

orr

ie

nte

 c

on

 p

ro

te

cc

n G

FC

(e

l c

irc

uit

o d

eb

e t

en

er 

el m

is

mo

 v

olt

aje

 d

e la

 b

om

ba

).

4.

Sit

ua

nd

o la

 b

om

ba

 y

 p

ro

ce

dim

ie

nto

 d

e in

sta

la

ció

n:

—

Sit

 la

 b

om

ba

 c

om

o l

o i

nd

ic

a s

u m

od

elo

 e

sp

ec

ífi

co

qu

la

 b

om

ba

 e

sta

 p

la

na

 e

el 

fo

nd

o. 

Do

ble

 la

 

ab

ra

za

de

ra

 c

om

o s

e r

eq

uie

ra

 p

ara

 m

on

ta

rla

.

—

Us

an

do

 lo

s a

gu

je

ro

s o

blo

ng

os

 e

n la

 a

bra

za

de

ra

 c

om

gu

ía

ma

rq

ue

 y

 p

erf

ore

 d

os

 a

gu

je

ro

de

 1

/8

 d

pu

lg

ad

a.

—

La

 b

om

ba

 c

on

 d

os

 to

rn

ill

os

 #

10

 (p

ro

ve

íd

os

).

5.

Re

co

rra

 e

co

rd

ón

 d

la

 b

om

ba

 c

om

se

 in

dic

a, 

as

eg

urá

nd

os

e q

ue

 e

l c

ord

ón

 n

o t

oq

ue

 e

l a

gu

a o

 lo

fil

tro

s h

úm

ed

os

 y

 q

ue

 e

ntr

e e

n c

on

ta

cto

 c

on

 la

 tu

rb

in

en

 m

ov

im

ie

nto

 o

 e

ns

am

ble

 d

tra

ns

mis

n. 

De

je

 e

co

rd

ón

 lo

 s

ufi

cie

nte

 fl

ojo

 p

ara

 c

re

ar 

un

 la

zo

 p

ara

 

“e

sc

urr

ir”

 a

l a

gu

a a

nte

s d

e e

ntr

ar 

el 

co

rd

ón

 a

 la

 c

aja

 d

la

 b

om

ba

.

PR

EC

AU

CIO

N:

Re

co

rra

 e

l c

ord

ón

 d

e l

bo

mb

tra

de

 lo

su

je

ta

do

re

s d

e a

la

mb

re

 

as

eg

urá

nd

os

qu

no

 

to

qu

e e

l a

gu

a e

n a

mb

os

 

de

sit

os

 o

 lo

fil

tro

en

 la

 s

ec

ció

n h

úm

ed

a.

Legend

1.

Pump Cord Clips (approximate locations).

2.

Pump junction box assembly (JBK115 or JBK230). 
Using “Locate J-box here” label as a guide, 
position and install in indicated location using 
holes in junction box flanges as guides to locate 
self-drilling screws.

3.

Conduit and wiring from junction box to GFCI 

protected pump electrical supply (circuit must 
match pump voltage).

4.

Pump location and mounting procedure:

—

Position pump as shown for your specific model, 
make sure pump sits flat on bottom. Bend 
bracket as required to conform to the mounting 
surface.

—

Using slotted holes in bracket as a guide, mark 
and drill two 1/8” holes.

—

Secure pump with two #10 screws (provided).

5.

Route pump cord as shown, making sure cord does 

touch water or wet pads and cannot be pulled into 
the moving blower wheel or drive assembly. Leave 
sufficient slack in cord to create a “drip” loop just 
before the cord enters pump housing.

CAUTION:

Route pump cord 
through wire clips 
making sure cord 
does not touch 
water in either the 
bottom pan or the 
pads in the frame.

 

 

 

 

 

 

 

 

 

 

 

 

ID500

IS500

ID601

IS601

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ID701
ID800

IUP701
IUP800

IS701
IS800

UL Classified  Aerocool Industrial / Commercial Evaporative Cooler Use and Care Manual   7

Summary of Contents for AEROCOOL ID500

Page 1: ...motr z 4 Ajuste de banda 4 Instalaci n del tubo de rebosadero 4 Instalaci n de las l neas de agua 4 Instalaci n de bomba 4 Instalaci n de la sangr a 4 Inspecci n General 5 Pre comienzo 5 Comienzo lis...

Page 2: ...dificio deben ser dise ados fabricados e instalados por un contratista competente en hojalater a HVAC preferible mientras que el edificio est bajo construcci n Salidas de aire Los enfriadores de aire...

Page 3: ...soplador y ajuste la tensi n de la banda v ase ajuste de banda Gire la turbina con la mano para ver si se mueve libremente sin rozar en contra de la caja del soplador Despu s de instalar la banda s r...

Page 4: ...hule en el buje Inserte el buje en el agujero del fondo y apriete la tuerca Atornille el tubo de rebosadero de pl stico al buje y apri telo ligeramente apretado con la mano para prevenir fugas Conect...

Page 5: ...os y tuercas Revise la torsi n de los tornillos opresores y del gabinete P Motor y turbina tornillos opresores polea 95 in lb P Turbina tornillos opresores 1 por lado 150 in lb P Tornillos del gabinet...

Page 6: ...eras de la bomba est n permanentemente lubricadas Cambiando o remplace los filtros PRECAUCION Desconecte toda la corriente el ctrica del enfriador antes de intentar instalar abrir o darle servicio a s...

Page 7: ...rd n a la caja de la bomba PRECAUCION Recorra el cord n de la bomba a trav s de los sujetadores de alambre asegur ndose que no toque el agua en ambos dep sitos o los filtros en la secci n h meda Legen...

Page 8: ...all electrican ACCI N CORRECTIVA 1 Revise suministro A Remplace el fusible B Restablecer disyuntor 2 Ajuste o remplace la banda 3 Remplace el motor A Ajuste banda o remplace B Lubricar remplazar cojin...

Reviews: