Copyright © 2011, PHONO SOLAR
Page 21 of 29
STEP 6:
Locate and place lower half of connector onto AC wire
STEP 7:
Align upper and lower halves of connector. Before securing connector, verify
alignment by observing to ensure connector „teeth‟ penetrate the outer jacket. Visually verify
the teeth will not miss any wire. Secure by pressing the two sections together evenly.