background image

 
 
EDF ENR PWT 

 

 

 

 

 

 

 

D06

P06

01

   

Indice

 

1

   

Date:

   

3

01

13

 

EDF

 

ENR

 

PWT

 

 

Société

 

par

 

actions

 

simplifiée

 

à

 

associé

 

unique

 

 

au

 

capital

 

de

 

37

 

505

 

000

 

 ‐ 

 

513

 

281

 

972

 

RCS

 

NANTERRE

 

Siège

 

social

 

:

 

100

 

Esplanade

 

du

 

Général

 

de

 

Gaulle

 

 

Cœur

 

Défense

 

 

Tour

 

B

 

92932

 

Paris

 

La

 

Défense

 

cedex

.

 

33,

 

Rue

 

Saint

 

Honoré

 ‐ 

Z.I.

 

Champfleuri

   

38300

 

Bourgoin

 

Jallieu

 ‐ 

France

 

Tel

 

:

 

04

 

74

 

93

 

80

 

20

 ‐ 

Fax

 

:

 

04

 

74

 

93

 

80

 

40

 

 

current (for a total of 1.56), and a correction factor for an open circuit (see Table 1 below) for sizing conductors and 

fuses may be applicable, depending on your local regulations. 

 

 

Table 1: Low temperature correction factors table for open-circuit voltage 

 

 

 
 
4.0  STORAGE AND UNPACKING 

 

Precautions and General Safety 

 

Store modules in a dry and ventilated room. 

 

Do not allow children and unauthorized persons near the installation site or storage area of modules. 

 

Do not transport modules in an upright position.   

 

Unpacking module pallet with care and follow the unpacking steps marked on the pallet. Be careful when 

unpacking, transporting and storing the modules.     

 

Do not carry a module by its wires or junction box. Carry a module by its frame with two or more people.   

 

Do not place modules on top of each other.   

 

Do not place excessive loads on the module or twist the module frame.

 

 

 

Do not stand, step, walk and/or jump on the module.     

 

Do not drop or place objects on the modules (such as tools.)     

3

Summary of Contents for EDF ENR PWT

Page 1: ...hese instructions may result in death injury or property damage The installation of solar modules requires specialized skills and should only be performed by licensed professionals The word module or...

Page 2: ...aterial to halt production of electricity when installing or working with a module or wiring Do not install or handle the modules when they are wet or during periods of high wind Do not use or install...

Page 3: ...n factors table for open circuit voltage 4 0 STORAGE AND UNPACKING Precautions and General Safety Store modules in a dry and ventilated room Do not allow children and unauthorized persons near the ins...

Page 4: ...s please ensure the assembly is mounted over a fire resistant roof covering rated for the application Photowatt modules have been listed as Class C according to UL790 standard PW series solar modules...

Page 5: ...fixed in place in a manner suitable to withstand all expected loads including wind and snow loads A minimum clearance of 6 5 mm 1 4 of an inch or more between modules is required to allow for thermal...

Page 6: ...r M5 size SS cup washer and M5 size SS nut with teeth is used to attach a copper grounding wire to grounding hole on the frame see picture above Attach the wire between the flat washer and the cup was...

Page 7: ...g holes short side 6 Module frame 7 Cables and connectors The mounting design must be certified by a registered professional engineer The mounting design and procedures shall comply with local electri...

Page 8: ...will void the warranty Each module must be securely fastened at a minimum of 4 points on two opposite sides If additional wind loads are anticipated for this installation additional mounting points s...

Page 9: ...local fire building and electrical codes Ensure that they are in perfect electrical and mechanical condition The permitted type of solar cable is single conductor 2 5 10 mm2 8 14 AWG 90 C wet rated w...

Page 10: ...ance Tel 04 74 93 80 20 Fax 04 74 93 80 40 ANNEX MECHANICALAND ELECTRICAL RATINGS Standard Test Conditions are irradiance of 1 kW m2 AM1 5 spectrum and cell temperature of 25 C Pmax of any individual...

Reviews: