EDF ENR PWT
D06
‐
P06
‐
01
Indice
1
Date:
3
‐
01
‐
13
EDF
ENR
PWT
Société
par
actions
simplifiée
à
associé
unique
–
au
capital
de
37
505
000
€
‐
N°
513
281
972
RCS
NANTERRE
Siège
social
:
100
Esplanade
du
Général
de
Gaulle
–
Cœur
Défense
–
Tour
B
92932
Paris
La
Défense
cedex
.
33,
Rue
Saint
Honoré
‐
Z.I.
Champfleuri
38300
Bourgoin
Jallieu
‐
France
Tel
:
04
74
93
80
20
‐
Fax
:
04
74
93
80
40
5.1 MOUNTING INSTRUCTIONS
Photowatt PV Modules
For a clear understanding of module, please refer to the illustration of a module shown below:
Reference
Designation
1 Grounding
holes
2 Junction
box
3
Standard mounting holes
(long side)
4
Additional mounting holes
(high wind or snow loads)
5
Standard mounting holes
(short side)
6 Module
frame
7
Cables and connectors
The mounting design must be certified by a registered professional engineer. The mounting design and
procedures shall comply with local electrical and building codes.
Mounting hardware may not be provided by EDF ENR PWT.
Photowatt modules can be mounted to a support structure with several approved methods, either using the
mounting holes on the back frame. (see Example A), or by means of clamps (see Example B). For
inlay-systems or other installation hardware, please contact your local representative for further information.
Example A:
Example B:
Bolting
Clamping on
Use appropriate corrosion-proof fastening materials. All mounting hardware (bolt/spring washer/flat
washer/nut) should be made with stainless steel, M6 size for bolting method (A), and M8 size for clamping
method (B).
(+)
(–)
1
1
4
4
3
3
7
2
5
5
4
4
6
6
7