2.1
Installation Procedure
Input operating
voltage
To convert operating voltage, an internal jumper must be changed.
Only qualified personnel are allowed to change this jumper.
Note
This unit can radiate radio frequency energy. Be sure that you
install it according to instructions or interference could result.
The unit protects against interference in a commercial
environment. If operation in a residential area causes
interference, it is the user's responsibility to correct this
problem.
To install the DIGITEL, perform the following procedure.
I. Before making connections, make sure that the following items
have been configured on the rear panel (Figure 2-1 ):
•
torr or pascal pressure readout is selected
•
ion pump size (both switches must be set to the correct size)
See Subsection 3.2.2 to set the pump size.
High voltage
jacks �
Readout
__ _
Pump size
-- - - - -- - ------------
�
----- - ---------------- -------------
SET BOTH SWITCHES TO
----_____ ✓----- ,----�
POWER
' SELECT PUMP SIZE
J612
-
INTERLOCK/
© MONITOR OUTPUTS
J611
J610
SETPOINT CMPTR INTFC
',I( HIGH
'
LOSS DISPLAY
'
VOLTAGE SAFETY, RESTART UNITS ,,--- PUMP SIZE ----,
OU
�
' INTLK •
@
@
1�,
$\
A�l9
T()_RR
(�ii
U
\\
fJ
·1
Ys
J617
\\ -
·
-�=
r�r
PA
�r
2
8
0
2sa20 1
\\
WARNING
For continued protection
against risk of fire or shock
replace only with same type
and rating of fuse ..
INPUT POWER
For 22ovrv Use T10A(sloblo)
'----- - - - -
-- - - -
-----==�=-----
-
--
Ground connector-
______---------
2-2
Installation
Figure 2-1. Rear Panel of the DIGITEL
2. Place the unit in its location and secure as necessary.
3. With power disconnected, connect the 15 ft. (457 cm) grounding
wire between the pump and the safety ground at the rear of the
chassis (Figure 2-1 ).