Installation
6
PHYSIOTHERM-S
3
Installation
3.1
Requirements for installation
Before the unit can be installed and put into operation, certain requirements must
be fulfilled in the building where the unit is to be operated.
If the unit cannot be installed immediately after delivery, the unit and its external
components or accessory elements must be stored in their original packaging in a
dry place!
Do not store or operate the unit in a dusty environment!
3.2
Requirements of the installation location
The unit must be installed so that there is no danger to the patient, the operator or
other persons!
Therefore, you must read the safety instructions in section
on page
46 and the following information:
•
By selecting a suitable location for setting up the unit or by means of structural
measures, contact during the treatment by the personnel or the patient with
conductive materials that are earthed or have a high capacity to earth must be
prevented (e.g. heating pipes, water faucets, metal chairs, metal beds or other
earthed devices).
•
The unit must be set up so that the (normal) release of electromagnetic radiation
during operation does not hinder the function of other devices or data media.
The minimum distance to other devices or their power supplies or data transfer
lines is 6 meters! Please note that the radiation can easily pass walls, ceilings and
floors.
•
The room and the installation location must be large enough so that the unit
can be operated from the front even if the electrodes are positioned
inconveniently.
3.3
Transport of the unit
Measures concerning the transport of the unit from the manufacturer to the
operator are based on the individual circumstances and are defined in the general
terms of business.
In the event of subsequent transport of the unit, the dealer or the operator is
responsible for the unit and for compliance with the safety and accident prevention
regulations.