NOTICE
Impermissibly high load on the L-417.xx9211E1B
An impermissible high load impairs the motion of the platform and can damage the
L-417.xx9211E1B.
►
Pay attention to the
maximum permissible forces (p. 27)
that may act on the motion
platform.
►
In the case of multi-axis systems, include the masses of the positioners to be moved
when calculating the load.
Fixing the Load
1. If necessary: Insert the locating pins into the corresponding holes in the motion platform.
2. Align the load on the motion platform so that the mounting holes selected in the motion
platform can be used for mounting the load.
3. Place the load onto the motion platform so that the locating pins are inserted into the
corresponding locating holes in the load.
4. Tighten the screws in all mounting holes.
5. Check that the load is fixed firmly to the motion platform.
6.4
Connecting the L-417.xx9211E1B
Tools and Accessories
■
Suitable cable set
■
If necessary: Suitable screwdriver for the locking screws of the connectors.
■
Optional: Purge air connector with the following properties:
Pressure: 2 to 6 bar (200 to 600 kPa); purge air hose: Outer diameter 4 mm; air quality as
stated in the
specifications (p. 27)
Requirements
✓
You have read and understood the
general safety instructions (p. 7)
.
✓
You have read and understood the user manual for the electronics.
✓
You have installed the electronics properly.
✓
The electronics are switched off.
✓
The L-417.xx9211E1B is connected to the
protective earth conductor (p. 15)
.
NOTICE
Damage due to incorrect connection of the L-417.xx9211E1B!
Connecting unsuitable electronics or the wrong cable can lead to damage to the
L-417.xx9211E1B or the electronics.
►
Make sure that the electronics support the drive type of the L-417.xx9211E1B and has been
configured accordingly.
►
Use cables from PI miCos only to connect the L-417.xx9211E1B to the electronics.
►
Pay attention to correct
pin assignment (p. 34)
.
Connecting the L-417.xx9211E1B
1. If necessary: Remove the ESD protective caps from the connectors of the L-417.xx9211E1B.
2. All of the L-417.xx9211E1B's connections must be made in the following order:
a) Optional: Purge air connector
Permissible pressure: 2 to 6 bar (200 to 600 kPa)
6 INSTALLATION
L417M0017EN
‒
5/20/2019
18
M O T I O N | P O S I T I O N I N G