5 Installation
P-5x7/P-5x8 Positioners
PZ82E
Version: 3.2.0
23
Figure 7: Unwanted lever effect and center of load on the side of the platform
Figure 8: Mounting holes in the motion platform
Requirements
You have read and understood the general notes on installing (p. 17).
The P-5x7/P-5x8 is
not
connected to the electronics.
Tools and accessories
Screws of suitable size and length (p. 42)
Suitable screwdriver
Fixing the load
1.
Align the load on the P-5x7/P-5x8 so that the mounting holes in the load and motion
platform are in line.
2.
Insert the screws through the holes in the load into the selected mounting holes in the
motion platform of the P-5x7/P-5x8.
3.
Hold the load so that it cannot move while tightening the screws.
4.
Tighten the screws. When tightening the screws, pay attention to the torque range
(p. 45) specified, and avoid torques to the motion platform.
5.
Check that the load is firmly mounted on the motion platform.