32
2. During inhalation the patient must sit in an upright and relaxed position at a table
and not in an armchair, positioning the appliance on a flat and stable surface.
3. Remember not to hold the appliance in your hand during treatment and / or to
avoid prolonged body contact with the appliance.
4. Unscrew the safety valve cap (6) (the rotation direction is indicated with the let-
ter A) and fill the boiler with 800ml of demineralised or distilled water using the
graduated decanter (10) and funnel (13) which are included. The boiler filling
operations must be carried out with the appliance not powered. Screw the valve
cap back in completely, tightening it securely (the rotation direction is indicated
with the letter C).
During normal operation do not remove the guard from the sprayer.
NEVER submerge the appliance under a direct stream of running water.
For the boiler filling operations always use the graduated condensation
collection decanter and the funnel which are included.
5. Insert the nebuliser cup (1) in the sprayer and turn the stop (4) to lock it in place.
The nebuliser cup depleted water drain must be positioned downward.
6. Place the decanter (10) under the nebuliser cup drain (3) in order to collect the
discharged thermal water.
7. Take a bottle of thermal water and position it in the specific compartment. Then
position the underwater tube (8) in the same bottle. Ensure that the tube is posi-
tioned on the bottom of the bottle and close the bottle with the closing cap (12).
8. At the other end of the underwater tube connect it to the sprayer connector (11).
9. Before proceeding with activation of the appliance ensure that you have filled
the boiler with 800 ml of distilled or demineralised water and that you have com-
pletely screwed the valve cap (6) back on.
10. Connect the appliance electrical plug to the electrical mains.
11. To begin treatment switch on the appliance by pressing the luminous switch
(7) to the I position. The green switch will light up to indicate that the appliance
is correctly powered. Wait for an abundant steam jet emission (about 6 – 8 min-
utes), indicating that the device is ready for use.
12. Sit in front of the appliance at a distance of 20-40 cm and begin the treatment
which will last about 12-15 minutes (for 1L of thermal water).
TAKE PARTICULAR CARE NOT TO REMOVE THE BOILER GUARDS
PLACED NEAR THE NEBULISER NOZZLE