18. Commissioning
• Are all air ducts and components fully installed and airtight?
• Are all system components fitted and electrically connected?
• Is the electric wiring complete and the control unit fitted?
• Is the control unit provided with a proper electrical connection?
• Check system components and correct settings where necessary.
• Set system parameters, e.g. adjust volume flow/ventilation level.
• Configure system extensions correctly.
Ventilation level
Operating mode
Designation
Factory setting - single-room
application
0
Standby
mode
Standby mode means that the flaps are closed and the building is not
ventilated
No volume flow
1
Reduced ventilation
Operation with a reduced volume flow for minimum ventilation of the
building
25 m³/h
2
Standard ventilation
Operation with the dimensioned volume flow for normal ventilation of
the building
42 m³/h
3
Intensive ventilation
Operation with an increased volume flow, boost ventilation for short,
intensive ventilation of the building
60 m³/h
4
Automatic
Operation with demand-oriented control via VOC- sensor
25 - 60 m³/h
B
The ventilation system must be complete, connected and ready for operation before it is put into operation for the
first time. The unit can be put into operation and system settings can be configured only when all work on the system
is complete. The factory settings on the control unit may only be changed by a specialised company.
Incorrect settings may cause the unit to malfunction.
18.1. Basic questions with regard to commissioning
18.2. Setting system parameters