42
8.
System scheme:
Configuration mask with a graphic of the currently selected system
schema. For more Informations, see chapter “System schemes” in
the manual.
9.
assignment:
Check the IO configuration of the following screen and if necessary,
adjust the parameter by clicking on the name bar.
The first setting disables automatically an heating circuit module,
the second setting includes automatically one.
10.
System configuration:
Check the settings of the following screens and if necessary, adjust
the parameters by clicking on the different values.
11.
Heat circuit 1: Options
Those settings are for weather compensation with an mixed heating
circuit for heating and cooling.
At the following screen, you can adjust the parameters and the
heating curve if required.
Those specific screens depends on the different schematics.
12.
Hot water tank: Options
If an DHW tank is included into the schematic, you can specify the
options at this screen.
The following screen, is responsible for the main temperatures of
this DHW tank.
13.
Remote maintenance:
With this remote maintenance, and secure connection can be
activated via ON/OFF switch.
“
Internet available
” means, that the Internet is available but not
mandatory that a remote maintenance tunnel can be established.
“
Connected to server
” can be activated, if there is a contract with
PicoEnergy to get the KEBA access.
“
Systemname
” designate the unit for the network.