Picote Solutions Oy Ltd
35
www.picoteinstitute.com
STEP 5
Stop the pump and brushes and push back into the pipe to visually verify the
coating has covered all required areas evenly. Repeat this process in 1m / 3 ft
sections until the pipe is fully coated. The brushes should always be rotating when
being pulled through the pipe and stationary when being pushed into the pipe.
STEP 6
Average coat thickness is 0.7 to 0.8mm
(0.03”).
Carefully inspect that the resin
covers the pipe everywhere. Be especially careful around bends.
STEP 7
To speed up drying time, twenty (20) minutes after the first coat is complete apply
heat using the Picote Heater to the pipe before starting the next coat.
Please have a look at page 42 for more information about additional coats.
SAVE ALL WARNINGS AND INSTRUCTIONS FOR FUTURE REFERENCE
OPERATING THE COATING SYSTEM
34