7 Operation
7.1 Preparing the measurement
MIRAN DL-P1 operation is simple and easy. The instrument is placed outside the isolated
workspace and the end of the hose shall be drawn to the isolated workspace. Seal the
hose inlet so that the air will not flow through it. Connect the power supply to mains
power and switch the instrument on. After the instrument has booted up you can input
the Job ID / name for separating the datalogs more easily. The job ID / name has to be
input within 10 minutes of instrument startup.
7.2 Switching the instrument power ON and OFF
Switch the instrument power on and off with the power switch. Note that disconnecting
power supply from mains power will not shut down the instrument since it will start
using battery power. The instrument will operate with battery until battery is empty or
mains power is connected again.
Note that in case the battery is empty the instrument will not start unless the power
supply is connected to mains power.
7.3 Job ID / name
MIRAN DL-P1 uses a job ID or name for seprating datalogs from each other so that the
user does not need to write down when the work is started and stopped. This makes it a
lot easier to prepare reports either using cloud report service or USB datalogs. The job
ID / name must be given within 10 minutes of instrument startup, otherwise the datalog
will be saved under the previous job ID / name. (It is also possible to use one job ID /
name all the time and separate datalogs with timestamps)
In cloud based report service you can make the report simply by selecting the job
ID / name from the list.
When using USB datalogs the MIRAN Configuration Tool separates datalogs based
on job ID / name to different files
11/2017 Pietiko Oy p. 02 251 4402
info@pietiko.fi
13