Secondary Containment
from the Leak & Spill Experts.
®
New Pig Energy
8' Min.
Angled
Bracket
Steel
T-Post
Support
Sediment Removal Line
11"
Sand Tube
Bottom
Plate
Fill Slope
Undisturbed
Ground
Stabilizer
Panel
Trenchless
Curved
Silt Fence
25"
12"
Slope
Percent
Maximum Slope Length (ft) Above Fence
8 ft. T-Post Spacing
4 ft. T-Post Spacing
2 (or less)
500
1000
5
250
550
10
150
325
15
100
215
20
70
175
25
55
135
30
45
100
35
40
85
40
35
75
45
30
60
50
25
50
Both ends should extend at least 8 feet upslope at 45° to the
main fence alignment.
Install downslope of all disturbances in existing ground and parallel to
existing contours. Install silt fence on level grade.
A temporary barrier of curved geotextile (filter fabric) with sand tubes
attached to supporting t-posts to remove sediment from runoff below
disturbed areas.
Controls sheet flow runoff from small disturbed areas where the
discharge is to a stable area.
• Do not use in areas of concentrated flow (e.g. channels, swales,
erosion gullies, across pipe outfalls, or as inlet protection, etc.).
• Heavy vegetation should be removed prior to installation. The
fence can be used on rocky slopes if enough preparation is made
to ensure good contact of the sand tube with the underlying soil
along its entire length.
• Trenchless Curved Silt Fence should not be installed on
uncompacted fills or in extremely loose soils (e.g. sandy loam)
since this will likely result in undermining of the fence.
• Traffic shall not be permitted to cross the sand tubes.
• Should be installed at least 8 feet from the toe of fill slopes.
• Accumulated sediment shall be removed when it reaches 11" high
on T-posts. There are sediment removal lines on the studded T-post
stakes for easy identification.
• The Trenchless Curved Silt Fence shall be inspected weekly and after
each runoff event. Damaged sections shall be repaired or replaced
within 24 hours of inspection.
• Perform all preventive and remedial maintenance work — including
clean-out, repair & replacement — immediately following inspection.
• Maintenance and inspection must be continued until the site is
permanently stabilized.
• Upon stabilization of the area, the fabric, sand tubes, T-posts, stakes,
bottom plates, angled top brackets and pins shall be removed. Fabric
shall be properly disposed. Sand tubes, T-posts, stakes, bottom
plates, angled top brackets and pins in good working condition can
be reused on future installations.
Wooden
Stake
Wooden
Stake
Staples
Fabric
Section 2
Fabric
Section 1
T-Post
Joining Fence Sections
• 3 zip ties to join sections
• 1.25 lbs/ft studded T-posts
Elevation View
Place Fence on Existing Contour
Illustration PA DEP
Extend end of Fence at least 8 feet
upslope at 45° to Main Fence Alignment
NOTE:
T-posts are positioned on the fill slope side (see below)
Plan View
• Stakes spaced @ 4 ft. O.C.
• 1.25 lbs/ft studded T-posts
SEDIMENT BARRIER ALIGNMENT
APPLICATION
DEFINITION
PURPOSE
LIMITATIONS
MAINTENANCE
Zip tie