Getting started PiiGAB 810
Rev 1.00.01
© PiiGAB Processinformation i Göteborg AB
Page: 13
8.2
Communicate with the meter’s actual primary address
Always make sure the M-Bus meter responds to the actual primary address.
1. Configure as the picture shown below
2. Press the
Find
button to test communication with the M-Bus meter
As expected the meter responded to primary address 1.