MOTOR INSTALLATION:
The Pitts is provided with the firewall pre-mounted at the factory, laser marked where the centre-line is,
ready for you to simply square your engine to it.
The engine box come with the appropriate engine incidences applied, so all you need to do is make sure
that this any standoffs are all the same size to assure a correct engine incidence.
You can measure the distance between your engines mounting plate and prop hub, and compare the
distance between the firewall and spinner location, in order to calculate the size of standoffs required.
Once measured and marked out, drill your appropriate mounting holes and securely screw your engine
to the firewall using your preferred method , be that nut and bold or blind nut method.
Finally ecure the engines ECU to the engine box, we recommend on top of the firewall however this
may vary depending on your installation.
Summary of Contents for Pitts Challenger
Page 1: ...Pitts Challenger 87 2 20m 100cc MANUAL...
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 32: ...the pushrods provided...
Page 33: ......
Page 34: ......
Page 35: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 58: ......
Page 60: ......
Page 61: ...Note that the two laser cut holes are for the fuel and smoke tank vents...
Page 63: ......
Page 64: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 71: ......
Page 72: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 83: ......