3.2. Removal of Temporary Transport Beams and Fixation of the Machine
Use a pallet truck to lift the machine and place it directly on the desired location in the workplace. Unscrew the bolts that hold the
machine in place and remove the transport beams. Lift the machine, remove the beams and lower the machine onto the floor. Level
the machine by laying metal sheets under its legs, possibly anchor to the floor. Remove the anticorrosion film and dust from sliding
surfaces and apply oil. Ensure connection to the mains (see section 3.4.). Pour the coolant (maximum 15 litres) into the tank; the fluid
will gradually flow into the container in the base. The hydraulic unit is fitted with two filling holes that are covered by red transport caps
during the transport (see section 7.5.2.). The cap that is more accessible to the operator has to be removed and replaced by a filling
cap, otherwise a risk of making the entire system inoperable arises, along with the risk of pump damage.
When handling coolants, risks linked to hazardous substances cannot be avoided. Observe the national
norms and recommendations and manufacturer’s or your company’s operating instructions related to
safe handling of coolants.
3.3. Machine installation
Protect the machine against humidity, rain and dust!
The machine may be operated in the ambient temperature b 5° and + 40°C. The average air temperature must not
35°C within 24 hours.
+ 35°C. In temperatures below + 5°C the conventional coolants should be replaced by coolants designed for respective
temperatures. In addition to that, replace the oil in the hydraulic unit for a less viscous one.
3.4. Connection to the mains
Such operations must be carried out only by persons with electrician qualifications!
Make sure that the grid voltage, the voltage protection and the connection voltage comply with the power requirements specified in
the point 2. Technical parameters. Only current protection of S characteristics can be installed (for a frequency converter). When
connecting the machine to the mains (3 NPe 50 Hz, 400 V, TN-S),
mind the colour coding of wires carefully: L1
brown,
L2
black,
L3
grey,
N
blue,
PE
yellow-brown.
Improper connection of the neutral or PE wires may lead to damage of the electrical
equipment or to and electric shock!
Connect the power cable to a protected
16 A
socket, in case of direct connection to the mains it
is necessary to fit the supply with a lockable MAIN SWITCH. If the motor rotates in an incorrect direction, swap the conductors
L1
brown and
L2
black on the junction box.
Failure to observe the aforementioned may lead to incorrect rotation of the bandsaw and the coolant
pump. Danger: Damage to the machine!
3.5. Nameplate
The data are only illustrative
MANUFACTURER
MANUFACTURER`S ADDRESS
MACHINE MODEL
SERIAL NUMBER
TOTAL WATTAGE
OPERATING VOLTAGE
SAW BLADE SIZE
VOLUMETRIC FLOW
YEAR OF MANUFACTURE
MACHINE WEIGHT
RATED CURRENT
CONTROL VOLTAGE
MAXIMUM SYSTEM PRESSURE
3
dm /min
p
max
Pilous-pásové pily, spol. s r.o.
Producer
Železná 9, 619 00 Brno, CZ
Address
Blade
Q
Model
Serial No.
P
U
Year
I
ARG 260 plus S.A.F.
17/19/0067
2.7kW
3x400V/50Hz
2880x27x0,9
4,7
2019
580kg
6.2A
400/24
6 MPa
Summary of Contents for ARG 300 plus S.A.F.