Wiring
Operating Manual PSSu K F EI
1003303-EN-03
| 53
EMC-compliant wiring for connecting 2 proximity switches
C
Ini A
Ini B
GND
To avoid EMC interference we recommend that the shield on the sensor lines is only con-
nected to earth at a single point:
A
or
B
or
C
Conductor loops outside the shield must be avoided.
The shield must run continuously from the sensor to the evaluation device.
6.8
Function test during commissioning
An error must be simulated for each safety-related output during commissioning: The anti-
cipated error reaction must occur when an output has a short circuit to a supply voltage.
INFORMATION
The short circuit test must be performed on the load and not on the output
terminal.